Tenders
Tender/Enquiry No. | Description of Items / Work | Estimated Cost | Cost of Tender | Earnest Money Deposit | Last date & Time of Submission | Date & Time of Opening | Download |
---|---|---|---|---|---|---|---|
IICB/PUR/599/112/AMC/29RT/2022-23 | AMC OF SHIMADZU make HPLC System | 2023-02-25 upto 03:35 PM (IST) | 2023-02-27 at 03:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/112/AMC/30RT/2022-23 | AMC OF SHIMADZU make HPLC System SL NO L20234404201CD Model No Prominence UV RF | 2023-02-25 upto 03:30 PM (IST) | 2023-02-27 at 03:30 PM (IST) onwards |
Links1 |
|||
CSIR_IICB/Admn 26(777)/E/2022 | Repair and cleaning of ACP board and change of led light of ACP board with acrylic raising letter and fixing the same at CSIR-IICB Salt lake Campus Kolkata as per direction of engineer-in-charge |
INR 15180 |
2023-02-23 upto 03:00 PM (IST) | 2023-02-24 at 03:00 PM (IST) |
Links1 |
||
CSIR_IICB/ Admn 26(793)/E/2022 | Repair and renovation of Administrative officer's Room and wooden works in two labs at CSIR-IICB jadavpur and Saltlake Campus Kolkata |
INR 7120 |
2023-02-23 upto 03:00 PM (IST) | 2023-02-24 at 03:00 PM (IST) |
Links1 |
||
IICB/PUR/599/638/19(RT)/2022-23 | SUPPLY, INSTALLATION TESTING AND COMMISSIONING OF Microplate Multimode Reader. Cancellation of Tender Notice May find from Link2 | 2023-03-14 upto 03:00 PM (IST) | 2023-03-15 at 03:30 PM (IST) onwards |
Links1 Links2 |
|||
IICB/PUR/599/448/AMC/37/2022-23 | AMC OF ZETASIZER NANO ZS make Malvern Panalytical Ltd UK SL NO MAL 1030323 Model ZETASIZER NANO ZS | 2023-02-20 upto 03:30 PM (IST) | 2023-02-21 at 03:30 PM (IST) onwards |
Links1 |
|||
CSIR_IICB/Admn 26(782)/E/2022
2023_CSIR_14444_1 |
Estmate for supply, Fitting and Fixing of 80mm Foot Valve and Servicing over hauling of Water pump for untreated and treated water reservoir at CSIR_IICB, Saltlake Campus Kolkata 700091 |
INR 4000 |
2023-02-17 upto 03:00 PM (IST) | 2023-02-20 at 03:00 PM (IST) onwards |
Links1 |
||
CSIR_IICB/Admn 26(776)/E/2022
2023_CSIR_143269_1 |
Replacement of P.V.C water tank in RL Block roof top at CSIR_IICB, Saltlike Campus Kolkata 700091 |
INR 3360 |
2023-02-17 upto 03:00 PM (IST) | 2023-02-20 at 03:00 PM (IST) |
Links1 |
||
IICB/PUR/599/411/AMC/35/22-23 | AMC OF FAB EI Mass Spectrometer | 2023-02-13 upto 03:00 PM (IST) | 2023-02-14 at 03:30 PM (IST) onwards |
Links1 |
|||
CSIR_IICB/Admn 26(784)/E/2022
2023_CSIR_142111_1 |
Comprehensive Annual Maintenance Contract of Blue Star make Modular Walk-in Cold Room at 3rd floor of CSIR-IICB, Jadavpur campus |
INR 161542 |
INR 3231 |
2023-02-07 upto 03:00 PM (IST) | 2023-02-08 at 03:00 PM (IST) |
Links1 |
|
IICB/PUR/599/590/AMC/33/22-23
2023_CSIR_142724_1 |
AMC OF Local Biometric attendance System [Model No: Fortuna Gateway 2000TIP] to be effective for one year from the date of AMC/Work Order. Details given at Annexure-I | 2023-02-11 upto 06:00 PM (IST) | 2023-02-13 at 03:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/615/AMC/32/2022-23 | AMC OF SHIMADZU make HPLC System with accessories [P-Series, PDA Detector] to be effective for two years from the date of AMC/Work Order. | 2023-02-04 upto 06:00 PM (IST) | 2023-02-06 at 03:30 PM (IST) onwards |
Links1 |
|||
2023_CSIR_142358_1 | Non comprehensive annual maintenance contract and procurement of consumable materials and accessories for 250 KVA diesel Generator set installed at CSIR-IICB salt lake campus (DG set make-Kirloskar Bliss 25 KVA) |
INR 75000 |
INR 1500 |
2023-01-31 upto 03:00 PM (IST) | 2023-02-01 at 03:00 PM (IST) |
Links1 |
|
IICB/PUR/599/495/27/2022-23
2023_CSIR_142603_1 |
SUPPLY, INSTALLATION AND COMMISSIONING OF Differential Scanning Micro-Calorimeter (DSC). Revised Specification - Tender No. IICB/PUR/599/495/27/2022-23 - Link2 | 2023-03-06 upto 09:00 AM (IST) | 2023-03-07 at 03:00 PM (IST) onwards |
Links1 Links2 |
|||
IICB/PUR/599/618/28/ 2022-23
2023_CSIR_142263_1 |
SUPPLY, INSTALLATION TESTING AND COMMISSIONING OF SPECTROFLUOROMETER , Pre Bid Meeting Place: RED CARPET CONFERENCE HALL CSIR IICB KOLKATA | 2023-03-06 upto 03:00 PM (IST) | 2023-03-07 at 03:30 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/563/18/2022- 23 | Tender - Cancellation Notice - SUPPLY AND INSTALLATION OF CO2 INCUBATOR WITH OXYGEN CONTROL | 2023-01-31 upto 03:00 PM (IST) | 2023-02-01 at 03:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/618/28/2022-23 | SUPPLY, INSTALLATION TESTING AND COMMISSIONING OF SPECTROFLUOROMETER | 2022-03-06 upto 03:00 PM (IST) | 2022-03-07 at 03:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/112/AMC/30/2022-23
2023_CSIR_142103_1 |
AMC OF SHIMADZU make HPLC System [SL NO. L20234404201CD, Model No: Prominence UV RF] to be effective for one year from the date of AMC/Work Order. | 2023-01-28 upto 06:30 PM (IST) | 2023-01-30 at 03:00 PM (IST) onwards |
Links1 |
|||
2023_CSIR_142095_1 | AMC OF SHIMADZU make HPLC System [ SL NO. L20234403715CD, Model No VP-ISO ] ] to be effective for one year from the date of AMC/Work Order. | 2023-01-28 upto 06:30 PM (IST) | 2023-01-30 at 03:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/604/AMC/31/2022-23
2023_CSIR_142154_1 |
AMC OF Leica TCS SP8 STED [SL NO. 8100000577, Model No: TCS SP8] to be effective for one year from the date of AMC / Work Order. | 2023-01-28 upto 06:45 PM (IST) | 2023-01-30 at 03:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/641/26/2022-23 | NIR SPECTROMETER |
INR 250000 |
2023-02-28 upto 03:00 PM (IST) | 2023-03-01 at 03:30 PM (IST) onwards |
Links1 |
||
CSIR_IICB /Admin 26(785)/E/2022 | Provision of Energy Efficient and Emergency Lighting Arrangements at CSIR-IICB Salt Lake Campus |
INR 1450000 |
INR 29000 |
2023-01-25 upto 03:00 PM (IST) | 2023-01-27 at 03:00 PM (IST) onwards |
Links1 |
|
CSIR_IICB/Admn 26(736)/E/2022 | Repair and Maintenance of various Civil Works at CSIR-IICB Jadavpur Campus Kolkata |
INR 3690000 |
INR 73800 |
2023-01-19 upto 03:00 PM (IST) | 2023-01-20 at 03:00 PM (IST) onwards |
Links1 |
|
CSIR_IICB/Admn 26(771)/E/2022(2nd Call) | Non Comprehensive Annual Maintenance Contract of 625 KVA DG Set at IICB Salt Lake Campus including Procurement of Consumables of the DG Set for Two Years. |
INR 415000 |
INR 8300 |
2023-01-11 upto 03:00 PM (IST) | 2023-01-12 at 03:00 PM (IST) onwards |
Links1 |
|
CSIR_ICB/ Admn 26(779) /E/ 2022 | Comprehensive Annual Maintenance and Operation Contract of Blue Star make Central Air Conditioning Plant at CSIR-IICB, Jadavpur Campus, Kolkata |
INR 705982 |
INR 14120 |
2023-01-11 upto 03:00 PM (IST) | 2023-01-12 at 03:00 PM (IST) |
Links1 |
|
CSIR_IICB/Admn 26(779)/E/2022 | Comprehensive Annual Maintenance and Operation Contract of Blue Star make Central Air Conditioning Plant at CSIR-IICB, Jadavpur Campus, Kolkata | 2023-01-11 upto 03:00 PM (IST) | 2023-01-12 at 03:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/411/RT2/AM/22-23 | AMC OF SHIMADZU make GCMS-QP2020C [ SL NO. 021425501056 ] ] to be effective for one year from the date of AMC/Work Order. | 2022-12-31 upto 03:00 PM (IST) | 2023-01-02 at 03:30 PM (IST) |
Links1 |
|||
IICB/PUR/599/604/25/2022-23 | PMT Module Water cooled SP5/SP8, Part No. 15000906000001 | 2022-12-29 upto 03:00 PM (IST) | 2022-12-30 at 03:30 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/574/24/2022-23
CORRIGENDUM Link_2 , Date & time Corrigendum_3 |
SUPPLY, INSTALLATION TESTING AND COMMISSIONING OF BENCHTOP POWDER X-RAY DIFFRACTOMETER (XRD) | 2023-01-21 upto 03:00 PM (IST) | 2023-01-23 at 03:30 PM (IST) |
Links1 Links2 Links3 |
|||
IICB/PUR/599/569/AMC/23/2022-23 | COMPREHENSIVE ON-SITE MAINTENANCE CONTRACT FOR COMPUTERS, SERVERS, LAPTOPS, PRINTERS, SCANNERS AND WORKSTATIONS AT CSIR-IICB KOLKATA [JADAVPUR AND SALT LAKE CAMPUSES] FOR ONE YEAR PERIOD | 2022-12-28 upto 03:30 PM (IST) | 2022-12-29 at 03:00 PM (IST) onwards |
Links1 |
|||
CSIR_IICB/Admn 26(775)/E/2022 | Non comprehensive annual maintenance contract and procurement of consumable materials and accessories for 250 KVA diesel Generator set installed at CSIR-IICB salt lake campus DG set make-Kirloskar Bliss 25 KVA |
INR 75000 |
INR 1500 |
2022-12-16 upto 03:00 PM (IST) | 2022-12-19 at 03:00 PM (IST) onwards |
Links1 |
|
GEM/2022/B/2745080 | Ultra low temperature laboratory deep freezer (Q3) | 2022-12-14 upto 02:00 PM (IST) | 2022-12-14 at 02:30 PM (IST) onwards |
Links1 |
|||
GEM/2022/B/2630218 | Server (Q2) | 2022-12-06 upto 02:00 PM (IST) | 2022-12-06 at 02:30 PM (IST) onwards |
Links1 |
|||
GEM/2022/B/2630038 | Server (Q2) | 2022-12-16 upto 02:00 PM (IST) | 2022-12-16 at 02:30 PM (IST) onwards |
Links1 |
|||
GEM/2022/B/2763230 | fume hoods for laboratory with cubboard (Q3) | 2022-12-16 upto 02:00 PM (IST) | 2022-12-16 at 02:30 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/611/22/2022-23 | SUPPLY AND INSTALLATION OF INVERTED FLUORESCENCE TRINOCULAR MICROSCOPE | 2022-12-21 upto 06:00 PM (IST) | 2022-12-22 at 06:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/570/21/2022-23
CORRIGENDUM |
SUPPLY AND INSTALLATION OF INVERTED FLUORESCENCE TRINOCULAR MICROSCOPE | 2022-12-21 upto 06:30 PM (IST) | 2022-12-20 at 06:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/638/19/2022-23 | SUPPLY AND INSTALLATION OF MICROPLATE MULTIMODE READER | 2022-12-17 upto 06:30 PM (IST) | 2022-12-19 at 03:00 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/638/20/2022-23
CORRIGENDUM Link_2 |
SUPPLY AND INSTALLATION OF MULTICOLOUR REAL TIME PCR SYSTEM_CORRIGENDUM Link_2 | 2022-12-17 upto 06:00 PM (IST) | 2022-12-19 at 03:00 PM (IST) onwards |
Links1 Links2 |
|||
IICB/PUR/599/563/18/2022-23
Tender cancellation notice |
SUPPLY AND INSTALLATION OF CO2 INCUBATOR WITH OXYGEN CONTROL | 2022-12-26 upto 03:00 PM (IST) | 2022-12-27 at 03:30 PM (IST) onwards |
Links1 Links2 |
|||
IICB/PUR/599/623/09-RT/2022-23
Corrigendum Link_2 |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INVERTED FLUORESCENCE MICROSCOPE _Corrigendum Link_2 | 2022-12-15 upto 03:00 PM (IST) | 2022-12-16 at 03:30 PM (IST) onwards |
Links1 Links2 |
|||
IICB/PUR/599/411/AMC/01RT1/2022-23 | AMC OF SHIMADZU make GCMS-QP2020C [ SL NO. 021425501056 ] ] to be effective for one year from the date of AMC/Work Order. | 2022-11-26 upto 06:00 PM (IST) | 2022-11-28 at 03:00 PM (IST) onwards |
Links1 |
|||
CSIR_IICB/Admn 26 (778)/E/2022 | Painting and Aluminum Partition of Room No-30 & 21 at CSIR-IICB, Jadavpur Campus , Kolkata - 32 |
INR 422000 |
INR 8440 |
2022-11-17 upto 03:00 PM (IST) | 2022-11-18 at 03:00 PM (IST) onwards |
Links1 |
|
CSIR_IICB/Admn 26(769)/E/2022 | Repair, polishing and upgradation of wooden lab table ( with & with out reagent rack), Laptop/Desktop table etc. in Lab no. 25 or 27 , 237 at CSIR-IICB Jadavpur Campus Kolkata - 700032 |
INR 230000 |
INR 4600 |
2022-11-11 upto 03:00 PM (IST) | 2022-11-14 at 03:00 PM (IST) onwards |
Links1 |
|
CSIR_IICB/Admn 26(757)/E/2022 | Repair and Renovation of Canteen at CSIR-IICB Jadavpur Campus Kolkata - 700032 |
INR 977000 |
INR 19540 |
2022-11-11 upto 03:00 PM (IST) | 2022-11-14 at 03:00 PM (IST) onwards |
Links1 |
|
CSIR_IICB/Admn 26(740)/E/2022 | Repair and Renovation of Laboratory Rooms on the 4th floor at CSIR-IICB Jadavpur Campus Kolkata |
INR 2689000 |
INR 53780 |
2022-11-11 upto 03:00 PM (IST) | 2022-11-14 at 03:00 PM (IST) onwards |
Links1 |
|
CSIR_IICB/Admn 26(771)/E/2022 | Non Comprehensive Annual Maintenance Contract of 625 KVA DG set at IICB Salt Lake Campus including Procurement of Consumables of the DG set for Two Years. |
INR 415000 |
INR 8300 |
2022-11-11 upto 03:00 PM (IST) | 2022-11-14 at 03:00 PM (IST) onwards |
Links1 |
|
IICB/PUR/599/496/10(AMC)/2022-23 | AMC of BRUKER FT-NMR Spectrometer [Model: AV-600; Sl. No.: ZH071004/10503714] to be effective for one year from the date of AMC/Work Order. | 2022-11-14 upto 03:00 PM (IST) | 2022-11-15 at 03:30 PM (IST) onwards |
Links1 |
|||
IICB/PUR/599/570/13/2022-23
Corrigendum Link_2 |
SUPPLY AND INSTALLATION OF MICROPLATE SPECTROPHOTOMETER _Corrigendum Link_2 | 2022-11-30 upto 03:00 PM (IST) | 2022-12-01 at 03:30 PM (IST) onwards |
Links1 Links2 |
|||
IICB/PUR/599/618/15/2022-23
Corrigendum Link_3 |
SUPPLY, INSTALLATION AND COMMISSIONING OF TRAY LOADING FREEZE DRIER SUITABLE FOR FREEZE DRYING OF SAMPLES IN TRAYS [PRE BID CORRIGENDUM : file1]_Corrigendum Link_3 | 2022-12-03 upto 03:30 PM (IST) | 2022-12-03 at 03:00 PM (IST) onwards |
Links1 Links2 Links3 |